Whirlpool 30 " Eye-Level Gas Range Installation Instructions And Use And Care Manual - Page 8

Browse online or download pdf Installation Instructions And Use And Care Manual for Ventilation Hood Whirlpool 30 " Eye-Level Gas Range. Whirlpool 30 " Eye-Level Gas Range 32 pages. Freestanding gas range with self-cleaning oven
Also for Whirlpool 30 " Eye-Level Gas Range: Installation Instructions Manual (11 pages), Installation Instructions And Use & Care Manual (28 pages), Installation Instructions Manual (11 pages), Installation Instructions (5 pages), Installation Instructions Manual (28 pages), Installation Instructions Manual (48 pages), Installation Instructions Manual (32 pages), Installation Instructions Manual (12 pages), Installation Instructions (5 pages), Installation Instructions Manual (7 pages), Installation Manual (7 pages), Installation Instructions Manual (7 pages), Installation Instructions (5 pages), Installation Instructions Manual (7 pages), Installation Instructions Manual (10 pages)

Whirlpool 30
It is recommended that the vent system be installed before
the range hood is installed.
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for vent fittings.
Making the cutout to the bottom of the cabinet may be easier
to do prior to mounting the cabinet to the wall.
1. Disconnect power.
2. Determine which venting method to use: roof, wall, or non-
vented.
3. Select a flat surface for assembling the range hood. Place
covering over that surface.
WARNING
Excessive Weight Hazard
Use two or more people to move and install
range hood.
Failure to do so can result in back or other injury.
4. Using 2 or more people, lift range hood onto covered surface.
Range Hood Cabinet Cutout
1. Use a saber saw or keyhole saw to cut out the cabinet
bottom inside the cabinet frame.
NOTE: Frameless type cabinets require ¾" (1.9 cm) front lip
in the cabinet bottom. A ¾" (1.9 cm) thick filler strip (not
supplied) may be required for some types of cabinets. (See
Step 3 in the "Install Range Hood" section.)
A. Bottom of cabinet cutout
B. Bottom must be cut flush to the inside walls of the cabinet.
"
C. 10
(26.4 cm) min. from the inside of the cabinet front face
D. " (1.9 cm) thick front face required for cabinet bottom.
E. Front of cabinet
2. Complete cabinet preparation following the instructions for
your type of venting. Determine venting cutout locations and
cut out vent openings in the cabinets, walls and/or soffit.
8

INSTALLATION INSTRUCTIONS

Prepare Location

E
D
A
C
B
Venting Outside Through the Roof
Measure and mark the lines as shown. Use a saber saw or
keyhole saw to cut an opening through the top of the cabinet
and the roof for the vent.
Go to Step 3.
A
A. Cutout
B. 6¼" (15.9 cm)*
C. 7 " (19.7 cm) centerline to cabinet front
D. Centerline
*NOTE: For 12" (30.5 cm) high cabinets a 6¼" deep x 8" wide
(14.6 cm x 20.3 cm) rectangular opening in the cabinet top is
required for damper transition clearance.
Venting Outside Through the Wall
Install the 6" (15.2 cm) vent transition to the top of the range
hood liner using two 3.5 x 9.5 mm screws. Assemble the vent
duct that you will use over the 6" (15.2 cm) vent transition.
Measure from the bottom of the range hood liner to the
horizontal centerline of the vent opening (A).
B
A
A. Measurement A
B. Horizontal centerline of vent opening
C. Range hood liner
Remove the vent duct from the range hood liner.
C
B*
D
C