Firesense Dalton 63224 Manual - Page 5

Browse online or download pdf Manual for Outdoor Fireplace Firesense Dalton 63224. Firesense Dalton 63224 18 pages. Square aluminum lpg fire pit

ASSEMBLY

PREPARATION
Before beginning assembly, empty contents of carton and make sure all parts are present. Place all parts on a soft, level
surface for assembly. NOTE: It is best to use TWO PEOPLE to assemble this gas fire pit.
Estimated Assembly Time: 60 Minutes | DO NOT over tighten hardware!
1
Assemble the fire pit base: Locate Door Panel D, 3 Side Panels E,
Door Frame Leg F, and 2 Support Legs G.
Screw Studs O into the holes in the sides of all four legs,
including the leg pre-assembled to the door.
Beginning with Door Frame Leg F, join the Legs and Panels
together by fitting the holes on the sides of the Side Panels onto
the Studs installed earlier.
To secure the Legs to the Panels, place a Washer Q then a Spring
Washer R onto each Stud, then thread a Nut S onto each Stud.
Do not tighten the hardware until the entire base is assembled.
Then, firmly tighten all Nuts with the Wrench V, but DO NOT
OVERTIGHTEN.
2
Place Table Top C upside-down on a nonabrasive surface.
Carefully turn the assembled fire pit base upside-down and align
the holes in the top of the Legs with the holes on the underside
of the Table Top.
Place a Spring Washer N, then a Washer N on each of 4 Bolts M.
Insert Bolts through the 4 aligned holes and into the Table Top,
then tighten with Wrench U.
Cover bolt heads with Plastic Caps T.
Hardware Used: M Bolt (8x20mm) x 4
Contact us for assistance: (866) 985-7877 | www.balkenehome.com
N Washer/Spring Washer (8mm) x 4
T Plastic Cap x 4
G
E
E
G
D
E
F
1
T
M
N
2
Side Panel
Leg
Nut
Spring
Washer
Washer
5