Clarion 28184-2Y000 Service Manual
Browse online or download pdf Service Manual for Car Receiver Clarion 28184-2Y000. Clarion 28184-2Y000 10 pages.
■
SPECIFICATIONS
Sampling frequency:
Frequency response:
Signal to noise ratio:
Wow and flutter:
Power supply:
Current consumption:
Weight:
Specification and design are subject to change without
※
notice for further improvement.
■
COMPONENTS
PN-2144A-A/D-A
Main unit
Lock pin
Lock pin
PP-2144H-A/B
Main unit
Lock pin
Lock pin
■
NOTE
We cannot supply PWB with component parts in principle.
When a circuit on PWB has failure , please repair it by
component parts base. Parts which are not mentioned in
service manual are not supplied.
Clarion Co., Ltd.
Export Division - 22-3, Shibuya 2-chome, Shibuyaku, Tokyo, 150-8335 Japan
Service Dept.- 50 kamitoda,Toda-shi,Saitama,335 Japan Tel: 048-443-1111 FAX:048-433-6996
44.1kHz
5Hz to 20kHz (
1dB)
±
105dB (1kHz) IHF.A
below measurement limits
DC14.4V (10.8V to 15.6V)
negative ground
Less than 1A
3.8lb. (1.7kg)
−−−−−
331-2241-00
331-2241-10
−−−−−
331-2241-00
331-2241-10
Service Manual
NISSAN Automobile Genuine
6 DISC COMPACT CHANGER
PN-2144A-A
Model
(Genuine N0. 28184-4H000)
PN-2144D-A
Model
(Genuine N0. 28184-2Y000)
PP-2144H-A
Model
(Genuine N0. 28148-VB000)
PP-2144H-B
Model
(Genuine N0. 28148-VB700)
To engineers in charge of repair
■
or inspection of our products.
Before repair or inspection, make sure to follow
the instructions so that customers and Engineers
in charge of repair or inspection can avoid suf-
fering any risk or injury.
1. Use specified parts.
The system uses parts with special safety features
against fire and voltage. Use only parts with equivalent
characteristics when replacing them.
The use of unspecified parts shall be regarded as re-
modeling for which we shall not be liable. The onus of
product liability (PL) shall not be our responsibility in
1
cases where an accident or failure is as a result of un-
1
specified parts being used.
1
2. Place the parts and wiring back in their original positions
after replacement or re-wiring.
1
For proper circuit construction, use of insulation tubes,
1
bonding, gaps to PWB, etc, is involved. The wiring con-
1
nection and routing to the PWB are specially planned
using clamps to keep away from heated and high volt-
age parts. Ensure that they are placed back in their origi-
nal positions after repair or inspection.
If extended damage is caused due to negligence during
repair, the legal responsibility shall be with the repairing
company.
- 1 -
Published by Service Dept.
Tel: 03-3400-1121
298-5688-00 Sep.1998 P
Printed in Japan
PN-2144A / D
PP-2144H