ErgoCentric upCentric Power & Data Rail Manual - Page 16

Browse online or download pdf Manual for Racks & Stands ErgoCentric upCentric Power & Data Rail. ErgoCentric upCentric Power & Data Rail 19 pages.

Installation Guide
upCentric Power & Data Rail

Run Data Cables

Step 8: Run Data Cable into the Rail System
(Skip to step 9 if data cables are not used with the rail)
a) Wall Power Infeed Legs:
i . Feed the Ethernet Cables into the system through the upper
opening on the Infeed plate .
ii . Run the cables through the upper channel in the Power & Data Rail system,
ensuring that the Ethernet endings reach their intended locations (refer to layout
for larger systems) . Leave approximately 6"-12" of slack for each cable .
iii. Utilize wire the Data Cable Support Clip (E) to secure the wires to the top of the
upper channel as you run them through the system, ensuring they remain in place .
upCentric Power & Data Rail | Installation Guide
16