CaliBamboo Geowood Installation Manual - Page 4

Browse online or download pdf Installation Manual for Home Improvement CaliBamboo Geowood. CaliBamboo Geowood 8 pages. Flooring

Floating Click-Lock GeoWood Plank Installation (Pages 3-8)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at
P
A C E
Use 6mil Plastic on Concrete
Make sure the sub oor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the sub oor moisture prior to installation and apply
an appropriate moisture barrier such as 6mil Plastic on
concrete sub oors.
P A C E
GeoWood ooring can be used in areas ranging from
50°F to 100°F. The ideal indoor humidity range for
GeoWood is 35-65% relative humidity.
Page 4
GeoWood
Flooring Installation Guide
®
PREPARE
THE SUBFLOOR
CONTROL
ENVIRONMENT
50-100°
F
35-65%
rH

Pre-Installation

www.CaliBamboo.com
P A C E
Acclimate Your GeoWood Flooring for 24 hrs
For GeoWood ooring, lay boxes at on the oor and only
open box ends as shown above. Acclimate your oor as
close to the installation area as possible, for 24 hours in
normal living conditions.
P A C E
Baseboard
3/8" Spacer
3/8" Expansion Gap
Leave at least 3/8" expansion spaces between ooring and
ALL vertical objects (walls, cabinets, pipes, etc.) Large ooring
runs may require additional expansion space. Flooring runs
over 40 feet require additional expansion space or
transitional pieces. Undercut door jambs and casings to
provide adequate expansion space. Do not screw or nail
cabinetry or other permanent xtures to a oating oor.
Questions?
ACCLIMATE
FLOORING
EXPANSION
GAPS
(888) 788-2254
www.CaliBamboo.com