aerauliqa QR590E Installation Manual - Page 6

Browse online or download pdf Installation Manual for Heating System aerauliqa QR590E. aerauliqa QR590E 20 pages. Energy recovery ventilation unit with enthalpic heat exchanger

aerauliqa QR590E Installation Manual

5.4 Electric Connections

Make sure that the mains supply to the unit is disconnected before performing any installation, service, maintenance or
The installation and service of the unit and complete ventilation system must be performed by an authorized installer and in
The unit must be earthed.
The QR590E is wired internally from factory.
To connect the the CTRL-DSP to the mother board use a 4pole twisted-pair cable: max length 30m.
Figures below show the wiring diagram.
CTRL-DSP
HY input
(i.e.SEN-HY)
IAQ input
(Air Quality
i.e. SEN-CO
)
2
Boost momentary
switch (BST)
Dehumidifier output
(max 250Vac 5A)
Fig. 5.g Electrical connections on the motherboard fitted in the terminal box.
Inputs/commands
N°1 AC supply connector
N°3 on/off inputs (volt-free contacts), two for ambient sensors (named HY, IAQ) and one for boost momentary switch (named
BST).
N°1 1-10V analog input (named SLAVE).
N°1 jumper for SLAVE MODE selection.
N°1 4-pole connector for CTRL-DSP (RS485 plus 12Vdc supply).
Outputs
N°1 on/off output for pre-heating/post-heating (relay contact – 250Vac 5A).
N°1 on/off output for dehumidification (relay contact – 250Vac 5A).
6
WARNING
electrical work!
WARNING
accordance with local rules and regulations.
1
A
B
G
2
N
V
D
Heat output
(max 250Vac 5A)
SLAVE input
1-10V
J2 jumper for SLAVE mode
AC power supply