Blackberry ITC100-1 Installation Manual - Page 25

Browse online or download pdf Installation Manual for Radar Blackberry ITC100-1. Blackberry ITC100-1 28 pages. Dry van, insulated trailers roll-up doors
Also for Blackberry ITC100-1: Installation Manual (33 pages), Installation Manual (26 pages), Installation Manual (32 pages), Installation Manual (33 pages), Installation Manual (35 pages), Installation Manual (28 pages), Installation Manual (34 pages), Installation Manual (35 pages), Installation Manual (30 pages), Installation Manual (35 pages), Instruction Manual (33 pages), Installation Manual (32 pages), Installation Manual (26 pages), Installation Manual (25 pages), Instruction Manual (35 pages)

Blackberry ITC100-1 Installation Manual
BLACKBERRY RADAR H2 ITC100-1, ITC100-2, ITF100-1 INSTALLATION GUIDE
25
FLATBED AND HEAVY EQUIPMENT
(2) Using a "pea-sized" amount of lubricant, fully coat all sides of the O-ring.
4. Completely insert the inner housing into the outer housing. Use the two screws that were
provided with the device to secure the housing. IMPORTANT: Screw torque must be 3-3.5
in-lb. (0.35-0.4 N-m).
3-3.5 in-lb.
Screw
Torque
0.35-0.4 N-m