Aleko BSW07 Manual - Page 3

Browse online or download pdf Manual for Swing Set Aleko BSW07. Aleko BSW07 3 pages. Nest swing

Anchoring the Gym to the Ground
Step 1. Attach Ground Pegs to all 4 Nest Swing Bottom Legs using F6
fasteners.
5
Step 2. Place assembled Swing Set in desired location and dig a footing
5
F6
hole, measuring 12" (30cm) Long x 12" (30cm) Wide x 20" (50cm) Deep,
at the base of each support leg.
F6
35
Step 3. Prepare and pour concrete into the footing holes following
concrete manufacturer's instructions. Fully fill footing holes to be level
35
with ground surface.
Step 4. While Concrete is still wet, angle Ground Pegs toward opposing
F6
legs at roughly 120-degrees, then insert Ground Pegs into concrete
footing, making sure Swing set Bottom Legs do not sink below ground
surface (utilize concrete set time information). Use temporary support
made from wood or other material if necessary to prevent sinking.
Swing Set will be ready for use once concrete is fully set and cured
(consult concrete manufacturer's instructions).
Visit us at www.aleko.com for Tech Support, Customer Service,
and more great products for your Home, Garden, Patio and Pets!