Installation & Operation Manual

INSTALLATION INSTRUCTIONS:

Supplies required: (not required by Acorn)
1. Floor fastener anchors, washers and bolts.
2. Pipe Sealant or Teflon tape for sealing waste connections.
IMPORTANT: FLUSH WATER SUPPLY LINES PRIOR TO
CONNECTION TO SAFETY EQUIPMENT.
NOTES:
Top of spray nozzles must be between 33" - 45" from finished
—
floor in order to meet ANSI Z358.1
Bottom of shower head must be between 82"-96" from
—
finished floor in order to meet ANSI Z358.1.
Use hand tools and wrenches in a manner which will prevent
—
marring finished surfaces. Strap wrenches or tools with
plastic jaw linings are highly recommended.
Refer to Rough-in for location of supply and drain lines.
—
Fragments of Teflon tape or pipe sealant residue can
—
interfere with the proper operation of this unit. Ensure pipe
sealant methods do not cause contamination in the system.
Prior to beginning assembly, TURN OFF water supply to 1
—
¼" potable water supply line.
STEP ONE: PEDESTAL
1. Locate and assemble components "A, B, & C" to create
freestanding pedestal base using proper plumbing
techniques to seal all made up threads.
2. Position center of pedestal assembly a minimum of 0'-9"from
left and rear wall. Position from center of assembly a
minimum of 0'-11" from right side of wall.
3. While holding the assembly in position, mark floor flange
mounting hole positions.
4. Remove assembly and install appropriate anchors to receive
mounting bolts and washers.
STEP TWO: UPPER SHOWER ASSEMBLY
1. Assemble components "D, E, F, G, H, & K" to pedestal sub
assy in sequential order using proper plumbing techniques
to seal all made up threads.
2. Ensure that fittings are aligned and perpendicular as shown
to allow for later stages of assembly
3.Assemble components "I & J" in a similar manner.
4.Assemble component "K" to valve.
STEP THREE: SUPPLY AND SANITARY DRAIN
CONNECTION
Note: Refer to Rough-In for supply and drain line locations.
1. Install necessary pipe fittings (supplied by others) to make
connection to 1 ¼" NPT waste tee with sanitary drain line.
2. Install necessary pipe fittings (supplied by others) to make
connection to 1 ¼" NPT supply tee w/ potable water supply
line.
STEP FOUR: TEST
1. Verify ½" supply valve for eye/face wash and 1" supply valve
for shower are turned OFF.
2. Turn on water supply to 1 ¼" potable water supply.
3. Inspect system for leaks.
4. Verify shower and eye/ face wash flow properly.
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-250-001
H
G
I
J
K
F
E
L
D
C
M
INSPECTION
TAG
B
A
MOUNTING SCREWS &
HARDWARE TYPICAL
4X (PROVIDED BY
Step Five: SIGNAE AND INSPECTION
1. Install sign "L" with clear visibility as shown, with
appropriate hardware (supplied by others).
2. Attach inspection tag "M" supplied, with plastic zip tie to
½"line as shown.
Page 3 of 5
UPPER SHOWER
SUBASSY
SUPPLY LINE
CONNECTION
FITTINGS
(PROVIDED
BY INSTALLER).
PEDESTAL
SUBASSY
SANITARY LINE
CONNECTION
FITTING
(PROVIDED BY
INSTALLER).
INSTALLER).
Revised: 01/08/2013