DISCO DFP8160 Technical Newsletter - Page 5

Browse online or download pdf Technical Newsletter for Grinder DISCO DFP8160. DISCO DFP8160 5 pages. Request for periodic replacement brush/leveling stone (t2 pad washing unit [optional accessory])

Technical Newsletter
Procedures to replace the brush/leveling stone of the T2 pad washing unit (Continued)
Step No.
Install the new leveling stone and tighten the set screws on the holder lateral side (3 pcs).
12
・Install it so that the leveling stone's lateral side and the holder's lateral side are flat.
Looking at the leveling stone from the lateral side, verify whether its lower surface is
13
touching the holder.
If the leveling stone's lower surface is not touching the holder:
Remove the leveling stone from the holder and attach it again.
Install the holder of the leveling stone with the hexagon socket head cap screws (3 pcs).
14
Close the grinding section side cover at the Z1 side.
15
Effect initialization of the machine.
16
Perform the cleaning of the transfer arm 2 pad through the handy panel.
17
→Refer to Section 2-3-4, [Operation Screens for Transfer Arm 2] of Chapter G in the
Make sure that there is no problem with the transfer arm 2 pad cleaning result.
18
Disconnect the handy panel from its connector.
19
#tnl2019-0008e-rev1
# 5 / 5
When viewing the leveling stone from the top
【OK】
When viewing the leveling stone from the lateral side
【OK】
Maintenance Manual for operation details of the transfer arm 2.
Procedure
【NG】
Holder
【NG】
Holder