DISCOVER 950-0040 Installation And Operation Manual - Page 9
Browse online or download pdf Installation And Operation Manual for Gateway DISCOVER 950-0040. DISCOVER 950-0040 14 pages.
Connect LYNK LITE to one or more of the following:
• The LYNK Port of a Discover LITHIUM PROFESSIONAL battery.
• A USB device
5.3 LYNK Network Communication Cables
HAZARD OF EQUIPMENT DAMAGE
• Turn OFF all devices before connecting cables.
• Mixing the LYNK Network with other networks may result in
equipment malfunction and damage.
Failure to follow these instructions can damage equipment.
Networking Guidelines:
• Separate data and power cables and allow for separation between data
and power cables. Avoid interference and data corruption caused by
running network cables bundled with power cables.
• Allow for LYNK Network cable slack. Ensure that LYNK Network cables
are slack and not in tension.
• Isolate the LYNK Network. Do not mix other networks with the LYNK
Network.
The LYNK LITE Communication Gateway is internally terminated. A termination
resistor is not required.
LYNK Network Installation and Layout for LITHIUM PROFESSIONAL batteries:
1. Mount the devices according to their installation instructions before
beginning network installations.
2. Attach the
950-0038 DLP T Connector
(Figure 5). Ensure that the mating connectors are securely fastened.
3. Insert the male end of the cable into the female end of the
950-0038 DLP T Connector
4. Repeat until all batteries have been attached in a series network (Figure 6).
5. Attach one end of the series network to the LYNK Port on LYNK LITE.
Termination of the other end is not required.
CAUTION
NOTE
to the LYNK Port on each battery
and vice versa.
9