DISCOVER LYNK II User Manual - Page 15
Browse online or download pdf User Manual for Gateway DISCOVER LYNK II. DISCOVER LYNK II 18 pages. Sma sunny island
• Battery Type: LiIon_Ext-BMS
• Nominal capacity of the battery: Installed number of batteries x their nominal
capacity in Ah
After entering all parameters, the 'INIT MASTER OK START?' notification will
appear.
5. Press <ENTER> to confirm, and the following notification appears.
6. Press <ENTER> and hold until you hear an acoustic signal.
The operation of Sunny Island now begins.
• Nominal voltage for the battery is automatically set to 48 V.
• Only mandatory settings for basic operation of the Sunny Island system are available
for set up in the QCG.
7.2 Setting Up Sunny Island 4.4M, 6.0H, and 8.0H with Legacy Sunny Remote
Control
Geared to readers familiar with SMA Sunny Island operations, the following
instructions are for a system with a single Sunny Island in an off-grid application.
Refer to the Sunny Island Manual to install a system with multiple Sunny Island
inverters.
After installing the batteries described in the Discover Battery manual, follow the
SMA Quick Configuration Guide (QCG) instructions to set up the Sunny Island for
use with Discover Lithium batteries.
The Quick Configuration Guide (QCG) starts up during the initial startup of Sunny
Island. On the Sunny Remote Control – SRC-20 display, a menu structure guides the
user for the commissioning of the system.
1. Press the activation button on Sunny Island.
2. When the Sunny Island Remote Control displays 'Init System,' press and hold the
button on the Sunny Remote Control until an acoustic signal sounds three times,
and the Sunny Remote Control displays the QCG.
NOTE
Figure 6. Sunny Island with
Sunny Remote Control
15