Cubis stakkabox Installation Manual - Page 5

Browse online or download pdf Installation Manual for Plumbing Product Cubis stakkabox. Cubis stakkabox 12 pages.

Overbuilding Existing Services
8. Where chambers are required to be built over existing services, STAKKAbox can easily accommodate this by either:
8.1. Cutting a duct entry in the appropriate ring section as previously described and then with a hand saw cutting from the bottom of
the ring to make an open ended arch.
8.2. Alternatively, after the duct entry has been formed, the ring can be cut longitudinally and reassembled around the existing
duct.
8.3. In both cases it is important that a complete ring is installed either side of the cut ring section.
Wall Furniture & Security Systems
9. Wall furniture can be installed at this stage if not already factory fitted.
9.1. Mark the position of the furniture as required by the clients' specification on the chamber walls, drill 11mm holes and fix the furniture with
the bolts supplied.
9.2. If using Footway Fortress, the wall bears simple hang in the preformed slots.
9.3. Wall furniture and security systems can be retrofitted at a later date on most chambers. For specific details please contact
CUBIS directly.
www.cubis-systems.com
5