displayit Flare Assembly Instructions Manual - Page 3

Browse online or download pdf Assembly Instructions Manual for Projection Screen displayit Flare. displayit Flare 6 pages. 20' (230” x 92”)

5. Unroll the included spacing rulers and
place them on the ground inside the
frame. Overlap the two rulers aligning
the blue lines marked "Center foot
holes." Align the foot lines on the ruler to
the foot holes in the frame.
Use the ruler to locate the recommended
placement for the support poles, curtain
lights, and power supplies.
Diagram 3
Spacing Ruler Side A
displayit.com
6. Install each suport pole as noted on the ruler (Diagram 2).
A. Hook top hook into frame channel and swing down to vertical.
B. Repeat for the bottom pole until they meet in the middle.
C. Press the push-button and slide the lock tube over the end of the
other pole half until the button clicks.
Top of Frame
Pole without tube lock
Diagram 2
800.207.0311
Assembly Instructions Page 3
Ruler Side B
Rulers Overlapped
Green Line Aligned with
Center Foot Holes
Pole with push-button
and tube lock
Ruler Side A
Overlapped
After-Hours Emergency: Call or Text 678.723.5343
20' (230" x 92") Flare
Press
Lock Tube
Slide
Lock Tube
Bottom of Frame
Flare v3.2 Updated 9/4/2019
Spacing Ruler Side B