Aerial MURA PSGC Owner's Manual - Page 8

Browse online or download pdf Owner's Manual for Protection Device Aerial MURA PSGC. Aerial MURA PSGC 20 pages. Release kit

MURA Release Kit - User's Manual
6.2. Route cable down the back of the vest forming a loop. The loop should extend
through the webbing on the back of the harness as shown below.
6.2 Routing of MURA cable through webbing
Aerial Machine and Tool Corp.
Page 8