CAME A 5124 Installation Manual - Page 10
Browse online or download pdf Installation Manual for Garage Door Opener CAME A 5124. CAME A 5124 12 pages. Automation for swing gates

5.10 Application for outside openings
E
B
Supplementary bracket
- Measure the lenght of "A" and "B"
(see Tab 4).
- Attach the rear bracket together
with a supplementary bracket and
fasten both to the column.
- Open the gate (maximum 90°)
and measure "E" (see Tab 4), then
fasten the front bracket to the gate.
- Make the electrical connections as
shown in the fi gure.
- Re-position and adjust the opening
micro-switch.
7 Manutenzione
7.1 Manutenzione periodica
☞ Before any maintenance, disconnect power to prevent any possible dangerous
situations that can be caused by accidental movement of the operator.
Lubricate the pivot points with grease whenever abnormal vibrations or squeaking
occurs, as shown in the drawing.
A
Motor terminal block
Control panel terminal
block
Motor 1
Motor 2
TAB. A
A 3024 - A 3124 A 5024 - A 5124
A
130 mm
B
130 mm
E
720 mm
Outside
Insoide
N
M
F
F
N
M
F
F
1
1
N
M
F
F
2
2
200 mm
200 mm
920 mm
R
R
R
A
C
A
R
R
R
A1
C1
1
A1
R
R
R
A1
C2
2
A2