Baltimore Aircoil Company ICE CHILLER TSU-L184M Rigging And Installation Instructions - Page 2

Browse online or download pdf Rigging And Installation Instructions for Air Conditioner Baltimore Aircoil Company ICE CHILLER TSU-L184M. Baltimore Aircoil Company ICE CHILLER TSU-L184M 16 pages. Thermal storage unit for internal melt

About rigging and installation
The BAC equipment should be rigged and installed as outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all necessary equipment will be available at the job site.
Recommended maintenance and
monitoring programme
Checks and adjustments
Operating level
System charging
Inspections and monitoring
General condition
®
Ice Chiller
tank
®
(1)
Ice Chiller
water
- Quality
- Level
Ice thickness
Coil
Ice Logic™ Ice Quantity controller:
- condition of sensor
Refrigerant:
- Glycol quality
Cleaning procedures
Disinfection
Notes
1. Water treatment and auxiliary equipment integrated in the cooling system may require additions to the table
above. Contact suppliers for recommended actions and their required frequency.
2. Recommended service intervals are for typical installations. Different environmental conditions may dictate
more frequent servicing.
3. When operating in ambient temperatures below freezing, the unit should be inspected more frequently.
2
W W W . B A L T I M O R E A I R C O I L . E U
Start-Up
Monthly
Quarterly
X
X
X
Start-Up
Monthly
Quarterly
X
X
X
X
X
X
X
X
X
X
X
Start-Up
Monthly
Quarterly
X
Every 6 months
Every 6 months
X
X
X
X
Every 6 months
Annually
Shutdown
Annually
Shutdown
Annually
Shutdown
X
X