Baltimore Aircoil Company S1500E Installation Instructions Manual - Page 7

Browse online or download pdf Installation Instructions Manual for Cooling boxes Baltimore Aircoil Company S1500E. Baltimore Aircoil Company S1500E 16 pages. Options & accessories, open cooling towers

Access to fill pack

The Internal Sliding Platform can be used to access the fill pack, follow the next steps to move the sliding
platform to the fill side.
Remove the access ladder by removing the two M12
bolts.
Remove the handrail and vertical posts.
Assemble access ladder with two M12 bolts.
Now the platform can be used to access the fill pack.
Remove the M10 securing hardware on each side of the
platform.
Slide the platform to the fill side and secure again with
M10 harware.
Install the vertical posts and handrail.
W W W . B A L T I M O R E A I R C O I L . E U
7