Clearfield FieldSmart 48 Installation Manual - Page 10

Browse online or download pdf Installation Manual for Racks & Stands Clearfield FieldSmart 48. Clearfield FieldSmart 48 18 pages. Fiber distribution point (fdp) port outdoor wall box

FieldSmart
24 & 48 Port Outdoor Wall Box
Installation Manual

Fiber Splicing

1.
Route the buffer tube to be spliced in the slack
storage area and up to the cassette to be spliced.
2.
Mark the tie off point of the cassette with a marker.
Make sure to leave around 3 feet of extra buffer tube
after the mark to allow for slack in the cassette's
splice tray.
3.
Remove all Clearview Blue Cassettes from the wall
box that need to be spliced. This can be done by
opening the bulkhead and loosening the captive
screws on each side of the cassette which hold the
cassette to the bulkhead.
4.
Consult the Clearview Blue Cassette Installation Manual for splicing instructions, located under the Resources tab of
the Clearfield website, www.seeclearfield.com.
Viewable here:
https://www.seeclearfield.com/assets/documents/installation-manuals/clearview-blue-cassette-install-manual.pdf
10
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Fiber Distribution Point (FDP)
®
______________________________________________________
Manual 020012 REV A - Aug 2018