Clearfield FieldSmart 24 Installation Manual - Page 5
Browse online or download pdf Installation Manual for Racks & Stands Clearfield FieldSmart 24. Clearfield FieldSmart 24 18 pages. Fiber distribution point (fdp) port outdoor wall box
FieldSmart
Fiber Distribution Point (FDP)
®
24 & 48 Port Outdoor Wall Box
Installation Manual
________________________________________________________
Wall Box Installation
The wall box is installed via the 4 holes located on the tabs on
each corner of the rear of the enclosure.
Hold the wall box up to the mounting surface and mark the hole
locations with a marker.
Note: A level may be used to ensure that the wall box is
mounted straight.
Pilot holes can then be drilled at each mark. Using appropriate fasteners for the material, attach the wall box to the surface.
5
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020012 REV A - Aug 2018