Camoplast Tatou UTV T4S Installation Manuallines - Page 11
Browse online or download pdf Installation Manuallines for Automobile Accessories Camoplast Tatou UTV T4S. Camoplast Tatou UTV T4S 15 pages. Track system
Also for Camoplast Tatou UTV T4S: Installation Manuallines (18 pages), Installation Manuallines (14 pages), Installation Manuallines (14 pages)
11. Verify that spring assembly bolt (G) is tightened
to the recommended torque specification: 40
N•m [30 lb•ft]. Refer to Figure 14.
Figure 14
12. Inspect the rear track systems and ensure that
all mounting bolts were correctly tightened
during installation. Lower the vehicle to the
ground and proceed to install the front track
systems.
Installation Guidelines / Directives d'installation
11. Vérifier que le boulon du ressort (G) est serré au
couple recommandé : 40 N•m [30 lb•pi]. Voir la
Figure 14.
12. Inspecter les systèmes de traction arrière et
s'assurer que tous les boulons ont été serrés
correctement lors de l'installation. Abaisser
ensuite le véhicule au sol et procéder à
l'installation des systèmes de traction avant.
Page 11