ClearSpan 104903 Assembly Instructions Manual - Page 3

Browse online or download pdf Assembly Instructions Manual for Greenhouse Kit ClearSpan 104903. ClearSpan 104903 19 pages. Premium solar star greenhouse

ASSEMBLY PROCEDURE

Following the instructions as presented will help ensure
the proper assembly of your greenhouse. Failing to
follow these steps can result in an improperly assembled
and anchored greenhouse. The steps outlining the
assembly process are as follows:
1. Verify that all parts are included in the shipment.
Notify Customer Service for questions or concerns.
2. Read these instructions, the MUST READ
document, and all additional documentation included
with the shipment before you begin assembling the
greenhouse.
3. Gather the tools, bracing, ladders (and lifts if
applicable), and assistance needed to assemble the
greenhouse.
4. Re-evaluate the location and site based on the
information and precautions presented in the
documentation included with the shipment.
5. Prepare the site (if this has not been completed).
6. Assemble the base frame and greenhouse
components in the order they are presented in these
instructions.
7. Anchor the greenhouse.
8. Read the Greenhouse Care and Maintenance
information at the end of these instructions.

REQUIRED TOOLS

The following list identifies the main tools needed to
assemble the greenhouse.
Tape measures or measuring devices
Variable speed drill (cordless with extra batteries
works best)
Hammers and gloves
Metal Snips or similar tool to cut flashing
Adjustable pliers and self-locking pliers
Ladders and/or work platforms
Adjustable Clamps to clamp panels together during
installation.
Additional tools and supports may be needed depending
on the structure, location, and application.
Visit www.ClearSpan.com for additional products and customer assistance.
UNPACK AND IDENTIFY PARTS
The following steps will ensure that you have all the
necessary parts before you begin to assemble the
greenhouse.
1. Unpack the contents of the box and place them
where you can easily inventory the shipment. Refer
to the Bill of Materials/Spec Sheets.
2. Verify that all parts listed on the Bill of
Materials/Spec Sheets are present. If anything is
missing or you have questions, consult the Pictorial
Parts Guide for clarification, or contact customer
service.
NOTE: At this time, you do not need to open the plastic
bags containing the fasteners.
WARNING: FLASHING IS SHARP! USE GLOVES
WHEN HANDLING AND DURING ITS INSTALLATION.
PANELS ARE HEAVY. USE CAUTION AND
ASSISTANCE WHEN LIFTING AND DURING
INSTALLTION.
2 of 18