Dixon Bayco 5200-SFI-3 Maintenance & Operating Instructions - Page 3
Browse online or download pdf Maintenance & Operating Instructions for Cables and connectors Dixon Bayco 5200-SFI-3. Dixon Bayco 5200-SFI-3 3 pages. Sight glass kit
5200-SFI and 5200-SFI-3 Sight Glass Kit
Assembly
1. Insert the new O-rings in to the grooves.
2. Apply O-ring lubricant on the outside face of the sight glass to
reduce friction. Position the new sight glass as shown in figure 2,
making sure that the edge with the chamfer will pass the O-rings first
then press the sight glass evenly into the bore. If necessary use the
old sight glass to push down the new sight glass.
3. Insert retaining ring into the groove in the body.
4. Verify the new seals and sight glass do not leak by capping one
end and applying low air pressure (3 to 5 PSI) and checking for air
bubbles under water.
Figure 2 – Sight Glass Assembly
Dixon Bayco Warranty
For complete warranty information, please refer to the latest
Dixon catalog.
5200-SFI and 5200-SFI-3
877.582.3569
3