DK2 Power OPC503 Instructions Manual - Page 10
Browse online or download pdf Instructions Manual for Construction Equipment DK2 Power OPC503. DK2 Power OPC503 14 pages. Chipper shredder top loading
Also for DK2 Power OPC503: Assembly Manual (13 pages), Assembly Manual (15 pages), Installation Manual (20 pages)
OPC503 INSTRUCTIONS
Install Vacuum Door
1. Remove bolts and Feed Chute
3. Align holes and Door Frame
5. Remount the feed chute and bolts
2. Remove chute and Clean the
mounting area of all debris
HOLE
4. Install Door with flange DOWN
and hole to the left side.
6. Door slides in-out freely