DK2 Power OPC503 Instructions Manual - Page 4

Browse online or download pdf Instructions Manual for Construction Equipment DK2 Power OPC503. DK2 Power OPC503 14 pages. Chipper shredder top loading
Also for DK2 Power OPC503: Assembly Manual (13 pages), Assembly Manual (15 pages), Installation Manual (20 pages)

DK2 Power OPC503 Instructions Manual
OPC533 INSTRUCTIONS
Install Vacuum Door
1. Remove bolts and Feed Chute
2. Clean the area of all debris
3. Align holes and Door Frame
4. Install Door with flange up
5. Remount the feed chute and bolts
6. Door slides in-out freely