Cutting Edge CEP400 User Manual - Page 6
Browse online or download pdf User Manual for Battery Charger Cutting Edge CEP400. Cutting Edge CEP400 19 pages. Mppt charge controller
6. Wire Connection Sequences
During installation of your MPPT controller, please follow the order of connection below:
1.
Connect the positive battery wire followed by the negative battery wire.
2.
Make sure your solar panels are fully covered to prevent electrical shock.
Connect the positive solar array output wire followed by the negative solar array output wire.
3.
Connect DC load wires to the DC load output (if applicable).
4.
Connect the external temperature sensor to its terminal shown above.
5.
Connect the mobile application module to the communication port (if applicable).
7