ALUZ A1-ZIBI-STN-RGBW Installation Instructions Manual - Page 4

Browse online or download pdf Installation Instructions Manual for Lighting Equipment ALUZ A1-ZIBI-STN-RGBW. ALUZ A1-ZIBI-STN-RGBW 12 pages. Surface standard rgbw

DRY LOCATION APPLICATIONS
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Use 1 mounting clip every 2', rounded up. Use a minimum of 2 mounting clips
per luminaire segment. For vertical applications, create a stopper at the
bottom of the run to prevent sliding.
3
Use a mounting clip at the junction between two luminaire segments.
Example: 20' Run.
8'
3" Gap
Mounting Clip
4
Lay mounting clips along reference line and pre-drill using an appropriate
drill bit for surface material and screw size. Typical screw size is 8/32 x 1".
Note: Allow 1/4" clearance on each side of mounting clip to account for
lateral expansion. Only install mounting clips on flat, even surfaces.
a
Screw mounting clips to surface, then snap luminaire into mounting clips.
Install set screws to each mounting clip, if applicable. Set screws are required
for downward facing, outward facing, and vertically mounted applications.
Set Screw
b
Screw mounting clips to surface, then snap luminaire into mounting clips.
Install set screws to each mounting clip, if applicable. Set screws are required
for downward facing, outward facing, and vertically mounted applications.
Set Screw
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZIBI Standard RGBW
(A1-ZIBI-STN-RGBW)
20'
8'
4'
Junction between luminaire segments
866.ALUZ.LTG | 714.535.7900
WET LOCATION APPLICATIONS
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Use 1 mounting clip every 2', rounded up. Use a minimum of 2 mounting clips
per luminaire segment. For vertical applications, create a stopper at the
bottom of the run to prevent sliding.
3
Space mounting clips evenly throughout the run.
Example: 20' Run.
8'
3" Gap
Mounting Clip
ASSEMBLED DIMENSIONS
2.55"
3.98"
2.97"
MC
MC with Louver
2.55"
4.99"
3.98"
MC-3
MC-3 with Louver
Mounting Clips
20'
8'
4'
Junction between luminaire segments
2.60"
3.98"
MC with Reflector
2.60"
4.99"
MC-3 with Reflector
Installation Instructions
4 / 29 / 2022 / Rev 2
Page 4 of 12
2.60"
2.60"