ALUZ A8-ZIZA-SOP Installation Instructions Manual - Page 5
Browse online or download pdf Installation Instructions Manual for Lighting Equipment ALUZ A8-ZIZA-SOP. ALUZ A8-ZIZA-SOP 12 pages.
ZIZA
Standard Optic
A8-ZIZA-SOP
APPLICATION GUIDELINES
• Follow the below diagrams and steps if applicable to your installation.
• LED lightstrip and modules require a team effort to ensure a secure and correct
installation.
• Use a wire puller stand to prevent tangles, twists, and snags when installing.
• For Mud-In applications, start lightstrip from power source side and allow up to
2" of excess lightstrip to exit through end cap.
LED LIGHTSTRIP
Installers must wear gloves to protect LEDs
ensuring adherence to extrusion
One person applies pressure to lightstrip, securing it to extrusion
SOLDERING GUIDE
1
Cut lightstrip to desired length. Include both sets of solder pads by cutting to
the left or right of designated markings, allowing more space for soldering.
Cut to size
2
Prepare wires by stripping 1/8" from the end of each wire, then tin the tips of
the wire with solder. Apply heat to stripped portion of wire, then add a small
amount of solder until stripped portion of wire is fully covered in solder.
3
If applicable, use a mat knife to remove encapsulation from the section of
lightstrip with solder pads. If lightstrip is not encapsulated, skip this step.
Remove encapsulation
from solder pads
Apply pressure to lightstrip,
Cut to size
Mat Knife
ALUZ
1170 North Red Gum Street, Anaheim, CA 92806
Phone: 800 921 2254 or 714 535 7900 | Fax: 714 535 7902 | [email protected] | aluz.lighting
© ALUZ All rights reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
NOTE
• Extrusions are shipped to exact length of specifi ed measurements.
• Due to cut increment restrictions (2",+/- 0.125" Tolerance), lightstrip is shipped
to the closest measurement ordered. The lightstrip must be centered inside the
extrusion.
Remove adhesive backing
45°
Another person unreels lightstrip from spool, holding at a 45° angle.
4
Solder lead wires to solder pads on the end of lightstrip. Solder the positive
wire (Red or Black with ridged jacket) to the pad marked "+24V". Solder the
neutral wire (White or Black with smooth jacket) to the pad marked "-".
Note: Solder iron not to exceed 720°F. Heat joint with tip of iron. Heat both
the solder pad and the wire. Add a small drop of solder on the tip of solder
iron to transfer the heat to joint quickly; it should melt and flow smoothly,
covering the wire and pad. Remove iron once enough solder has been added
to the components. Allow 5 seconds for the joint to cool.
5
If applicable, apply silicone over soldered connections. All connections must
be completely covered with silicone to create weatherproof seal. Only use
outdoor rated silicone. If lightstrip is not encapsulated, skip this step.
Note: Appearance of lightstrip may differ from example shown.
Refer to wiring diagrams before soldering any wires.
Installation Instructions
Application Guidelines
Weller 0.50" solder wire
Weller 0.50" solder wire
Cover connections
with silicone
9 / 1 / 2021 / Rev 0
Page 5 of 12
Solder covering
wire and pads
Solder covering
wire and pads