Count Data
The SU500 optical turnstile provides the following methods of outputting count data:
Ethernet / TCP/IP (Standard)
The SU500 can communicate count data directly to Alvarado's GateWatch server-based facility counting software in real time over
a TCP/IP network. An Ethernet cable connection is required per turnstile. For more information on GateWatch, visit
http://www.alvaradomfg.com/patron-counting-gatewatch10/.
Count Output Relay (Option)
The GWCB-12 is Alvarado's TCP/IP-enabled count controller. The SU500 outputs counts to the GWCB-12 via dry contact output
relays. The GWCB-12 can then communicates the data to GateWatch over a TCP/IP network.The GWCB-12 is typically used
when Ethernet communication to each turnstile is not available.
Local Counter (Option)
Battery-powered counters are integrated into the turnstile cabinet to conveniently track passages. Counters can be ordered in
reset or non-reset variants. Counters enable the SU500 to function as a standalone unit without the need for additional software or
hardware components.
Network Communication
SU500 turnstiles are TCP/IP enabled. Running Ethernet cabling to the SU500 master and center cabinets provides a number
of benefits: (1) It allows integration with Alvarado's GateWatch software. (2) It allows easy implementation of SU500 application
software updates and enhancements. If SU500's are networked, updates can be installed over the network. (3) Enables product to
take full advantage of future enhancements.
Pre-Installation Requirements
The pre-installation requirements listed below must be reviewed before installing the turnstile. These notes also serve as a
checklist that must be complied with after installation. The installation site should also be evaluated before actual installation of the
turnstile to ensure that future turnstile placement is possible and installed as desired. This evaluation includes proper spacing, a
firm foundation, and separate conduit runs for power and Ethernet lines.
Slab Requirements
The following slab requirements must be taken into consideration when selecting the installation location:
•
A level solid concrete pad with a minimum thickness of 4" (102mm).
•
Use full-sweep electrical conduit underneath the floor.
•
Three separate conduits for primary source power, Ethernet (if applicable), and the crossover cable must be used.
•
Cabinets must be installed plumb with the floor while level and square to each other.
Page 6
For Assistance: [email protected] +1 (909) 591-8431
SU500 Installation Instructions
SU500 Installation Instructions
Space Requirements (28" Lane)
For ease of installation and servicing, Alvarado recommends 6" of space between the cabinets and adjacent walls or other surfaces.
PUD1456R5-0
PUD1R5-0
NOTE
Figure 3
28" Single Lane - Plan, Elevation & Footprint Drawing
Plan View
Elevation View
For Assistance: [email protected] +1 (909) 591-8431
Footprint Drawing
All dimensions are approximate.