Alvarado MSGX-E Installation And Maintenance Instructions Manual - Page 9
Browse online or download pdf Installation And Maintenance Instructions Manual for Fencing & Gates Alvarado MSGX-E. Alvarado MSGX-E 20 pages. Full height maximum security gate
MSG Installation and Maintenance Instructions
Anchoring Instructions (Cont.)
8) Return the gate back over the anchor holes. Anchor
both sides with four (4) each 3/8-16 x 2 1/2" HHCS
bolts and flat washers. Make sure the bolts are snug
to keep gate secure.
9) Verify the gate is level in all directions. Adjust and shim as
necessary.
10) Torque all anchor bolts (8 total) to 25 ft-lbs. Verify that the gate is
level.
This completes the physical installation of the Maximum Security Gate.
Proceed to next section for wiring diagrams for electrically controlled models.
PUD1201R5-0
For Assistance: [email protected] +1 (909) 591-8431
Page 9