ACP RiderPro Product And Installation Manual - Page 9

Browse online or download pdf Product And Installation Manual for Construction Equipment ACP RiderPro. ACP RiderPro 17 pages. Motorcycle protection for acp sentry barrier tl-4 thriebeam system

9.5 Attaching the Beams

Potential Hazards:
Injury from movements and
posture, hand injury from pinch points, strain to wrists
from tightening bolts and excessive noise from use of
impact driver.
Recommended Control Measures:
techniques when lifting rails (bend at the knees), wear
gloves, use a pinch bar to align holes, use an impact
wrench to tighten bolts and wear appropriate hearing
protection.
Position the RiderPro beams below and parallel to the
thrie beam guardrail. Attach them to the mounting
brackets with two M16 x 35 mm guardrail bolt
in Figure 4) using standard nuts and round washers,
but do not fully tighten them yet.
Figure 4. Attachment of the RiderPro Beams to the ACP Sentry Thrie Beam Barrier System.
Ref: IM 031 Rev 00
Date: 15/07/2021
Page 9/17
Observe correct
(Ref.
1
The beams must be overlapped with the flow of
traffic so that the leading edge of the splice is
shielded from the nearside approaching traffic.
Splice beams together using four M16 x 35 mm 8.8
guardrail bolts (Ref.
round washers.
It could be helpful to use a pinch bar to align the
holes at the splice, to make bolt installation easier.
Any elongation of the splice holes is strictly
FORBIDDEN.
Tighten the four bolts of the splice to snug fit (no
specific torque is required), avoiding for now to
tighten the two bolts that connect the beams to the
mounting brackets (see § 9.7).
in Figure 4), standard nuts and
2
2
Property of
Margaritelli Ferroviaria S.p.A.
06135 Ponte San Giovanni - Italy