Etac Molift Air 350 Quick Manual - Page 2
Browse online or download pdf Quick Manual for Lifting Systems Etac Molift Air 350. Etac Molift Air 350 2 pages.
Lifter installation on trolley in rail
Connect one point first. Push button all the way in,
and place lifter in connection point on trolley. Release
button and make sure it is clearly showing green before
connecting the next point.
Make sure both connection point buttons completely
return and clearly show green after installation.
Emergency lowering cord and tube can be adjusted to
the correct length (height) by cutting tube and cord.
Use this checklist to verify that the hoist is properly installed
and can operate correctly and safely before use.
End stops on rail are installed after mounting of trolley
as described in BM4401
Make sure that the hoist is properly fastened to the rail
and that the lift does not have any loose parts.
Perform one lift with load (60-80 kg)
Make sure battery is fully charged.
Mounting suspension
1
3
1.
Align sling bar in connection point.
2.
Push button on locking pin and insert all the way through.
3.
Make sure locking pin is properly fastened
4.
Push and hold down the button on the locking pin, and
pull to remove locking pin.
2
4
Emergency stop
Pull to activate emer-
gency stop. The button
will come out, and hoist
will stop.
Electrical emergency lowering
Pull and hold to
start lowering.
Hold until client is
lowered and can be
released from sling
bar.
Only for emergency use when hand
control does not work!
Lifting and lowering
The sling bars hook design prevents sling to be
inadvertently detached when mounted correct.
Push with finger or
use tube on cord to
push button back in
to reset emergency
stop.