clivus multrum CM8 Installation Manual - Page 4
Browse online or download pdf Installation Manual for Toilets clivus multrum CM8. clivus multrum CM8 16 pages. Waterless composting toilet systems
Also for clivus multrum CM8: Installation Manual (18 pages), Installation Manual (18 pages), Installation Manual (19 pages), Installation Manual (19 pages)
TOOLS REQUIRED
Screwdriver
(Philips/plain)
Scissors/Knife
Jigsaw
MATERIALS REQUIRED
•
Bedding for CM8 tank.
•
Starter bulking material.
•
Water for wetting starter material.
•
Additional 50mm PVC pipe (coupling and bends if absorption trench is to be located some
distance away from tank). Pipe bends if needed for vent pipe.
•
In poor soil conditions, extra length of trenching arch or agi drain may be required.
•
Drainage gravel for excess fluids drain.
INSTALLATION SUMMARY
1. Ensure the tank is in a position so that the toilet chute will be perfectly straight over the
tank below.
2. Ensure the tank foundation is solid with a sand or crusher dust bed and has a slight slope
(3%) towards the front hatch.
3. Mark and cut holes in the floor for the toilet chute.
4. Mark and cut holes in the tank top.
5. Insert toilet chute and pedestal.
6. Install the vent system.
7. Install the liquid end-product drain pipe and absorption/transpiration trench.
8. Connect fan to power source.
9. Check everything is sealed.
10. Place a starter-bed of suitable bulking agent (e.g. wood shavings) in the unit.
11. Wet bulking agent before use of toilet.
12. Add starter bacteria after 10 days of use.
Spade
Drill
Tape Measure
Spirit Level
PPE
Marker
4
Caulking gun
Ladder