ClockedIn OnTIme Hardware Installation Manual - Page 7
Browse online or download pdf Hardware Installation Manual for Industrial Equipment ClockedIn OnTIme. ClockedIn OnTIme 13 pages.
9. Not in-line with hidden cables within walls
8. Installation Stage 2
1. Place angled mount against wall at the desired location and mark drill hole position on wall with pencil.
Ensure the angled mount is level.
2. Place power cable and transformer in angle mount. Use sticky pad supplied to hold in required position.
3. Feed short cable (with micro USB) plug through hole in Angled mount.
4. Drill holes in wall with appropriate drill bit size (7mm for masonry wall or 6mm for stud wall –
depending on type of wall fixing)
Installation Guide | April 2021
P
age 6
1C Uppingham Gate, Ayston road, Uppingham, Rutland, LE15 9NY
0845 4 903 901 | [email protected] | clockedin.uk
ClockedIn