Ashley EC95 Installation & Operation Manual - Page 7
Browse online or download pdf Installation & Operation Manual for Wood stove Ashley EC95. Ashley EC95 20 pages. Wood burning circulator heater
Also for Ashley EC95: Installation & Operation Manual (20 pages), Installation & Operation Manual (20 pages)
There are basically two methods of metal prefabricated chimney installation. One method is to install the chimney inside
the residence through the ceiling and the roof. The other method is to install an exterior chimney that runs up the outside
of the residence.
REMEMBER: Follow the chimney manufacturer's installation instructions and maintain the manufacturer's specified clear-
ance distance.
Additional chimney information is presented throughout this manual. READ IT THOROUGHLY TO BE MORE THOR-
OUGHLY INFORMED.
CONNECTION OF CHIMNEY CONNECTOR TO A MASONRY CHIMNEY THROUGH A COMBUSTIBLE WALL
PART A, FIGURE 7
(FIGURE 7 CONTINUED ON NEXT PAGE)
MINIMUM 12 IN.
TO COMBUSTIBLES
PART B
FIGURE 5 -
(FIGURE 5 CONTINUED)
EC95
MASONRY CHIMNEY
CONSTRUCTED TO
NFPA 211
MINIMUM CHIMNEY CLEARANCES FROM MASONRY TO
SHEET STEEL SUPPORTS AND COMBUSTIBLES 2 IN.
FACTORY-BUILT
CHIMNEY LENGTH
NONSOLUBLE
REFACTORY
CEMENT
CHIMNEY LENGTH
FLUSH WITH INSIDE
OF FLUE
AIR SPACE
9 IN. MINIMUM
MASONRY CHIMNEY CONSTRUCTED
TO NFPA 211
MINIMUM CHIMNEY CLEARANCE TO
BRICK AND COMBUSTIBLES IS 2 IN.
MINIMUM CLEARANCES 12
IN. OF BRICK ALL AROUND
CHIMNEY CONNECTOR TO
HEATER
FIRE CLAY LINER
(5/8" MIN. WALL THICKNESS)
MIN. 3-1/2" THICK BRICK
MASONRY WALL
MINIMUM CLEARANCE
9 IN. ALL AROUND
CHIMNEY CONNECTOR
TO HEATER
USE CHIMNEY MFRS. PARTS TO
ATTACH CONNECTOR SECURELY
SOLID INSULATED, LISTED
FACTORY-BUILT CHIMNEY LENGTH
SHEET STEEL SUPPORTS
(24 GAUGE MIN. THICKNESS)
7