aero pure ABF110DCMH-SG6 Handleiding voor installatie-instructies - Pagina 7
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} aero pure ABF110DCMH-SG6. aero pure ABF110DCMH-SG6 15 pagina's. Bath fan
Ook voor aero pure ABF110DCMH-SG6: Handleiding voor installatie-instructies (15 pagina's)
INSTALLATION I (NEW CONSTRUCTION)
CAUTION:
!
Please wear gloves during the installation work.
IMPORTANT:
Remove the tape from damper and adaptor
before installation. As shown below:
Joist situation:
Two cases of spacing L :
12 inches (305 mm)
A
16~24 inches (406~610 mm)
B
If the spacing L is 12 inches (305 mm) on joists,
A
please follow the installation step as (Fig.1).
Secure 4 screws (ST4X30) at flange of frame to the
joists. Then follow steps 6 to 9 of Installation
(page 6-8) to complete the installation.
If the spacing L is 16~24 inches (406~610 mm),
B
use the suspension bracket assembly.
L
I
4 Screws
(ST4x30)
Tap
Fig.1
Fig.2.a
Fig.2.b
7