coastTec 1000 Beknopte handleiding voor bediening en probleemoplossing
Blader online of download pdf Beknopte handleiding voor bediening en probleemoplossing voor {categorie_naam} coastTec 1000. coastTec 1000 2 pagina's. Smart-ups rack
Operation & Troubleshooting Quick Guide
Smart-UPS Rack (VA):
STEP 1:
Connect the UPS's Internal Batteries (Figure 1):
NOTE: The Battery Connector may vary depending
on the UPS model, Figure 1 illustrates a couple
variations. Please follow the illustration which best
resembles your UPS.
Procedure 1 (top diagram – SUA/SMX):
1.1
Remove the front bezel by pulling it away from the UPS. The
❶
fastening clips will automatically disengage
Connect the battery by pressing the Anderson connector into the
1.2
plug located on the UPS. A snap will be felt as the connector
engages the jack.
Some models will require loosening thumb-screw/s and opening
1.3
the metal battery door to access the battery connector
Specific to SMX750 models: Remove the battery pack, and reinsert
with the electrical connector pins facing inwards.
Close the metal battery door (replace the screws) and reinstall the
1.4
front bezel.
OR
Procedure 2 (bottom diagram – SUA3000/5000):
Remove the front bezel by pulling it away from the UPS. The
1.1
❸
fastening clips will automatically disengage
Connect the battery by pressing the Anderson connector into the
1.2
plug at the top of the battery compartment.
A snap will be felt as the connector engages the jack
Reinstall the front
bezel.
1.3
STEP 2:
Install UPS accessories (Figure 2):
NOTE: Ensure the UPS is turned off prior to
installing any additional accessories. Please
contact APC or coastTec for more information
on compatible parts.
❶
Install SmartSlot accessory (if applicable)
2.1
Install Step-down transformer (if applicable).
2.2
Install all external Battery Packs (if applicable). The External
2.3
Battery Pack connector is located on the rear panel of the UPS,
and is either BLACK (120V), BLUE (48V) or GREY (24V).
If the Connector is obstructed by a metal cover, remove the
❷
fastening screws and cover
STEP 3:
Connect wiring & charge UPS (Figure 3):
NOTE: Ensure equipment is turned off.
Connect equipment to the UPS
3.1
❶
(computer, network switches etc.)
3.2
Connect the UPS's Power Cord to a suitable
❷
power receptacle
Set UPS circuit breakers to the 'ON' position (if applicable)
3.3
Turn on the UPS by pressing the power button:
3.4
or
Wait for the UPS's Self-Test to complete, then power-up any
3.5
equipment.
Allow UPS to charge batteries for 24 hours prior to operating on
3.6
battery or performing additional Self-Test or Calibration tests.
c o a s t T e c _ O T Q G _ S U T 1 _ 2 0 1 8 0 8 1 7 V 1 . 0
750, 1000, 1500, 2000, 2200, 3000, 5000
❶
❷
OR
❷
❸
❹
❹
❷
❸
❷
❸
❶
Figure 1
❶
Figure 2
Figure 3
Page 1