BobsCNC E3 Handmatig - Pagina 5

Blader online of download pdf Handmatig voor {categorie_naam} BobsCNC E3. BobsCNC E3 8 pagina's. Cnc router engraver bearing and rail dust kit
Ook voor BobsCNC E3: Handleiding voor probleemoplossing (16 pagina's), Snelstarthandleiding (3 pagina's)

BobsCNC E3 Handmatig
Step 4
The two
Mounts (B & C) have slots that
allow them to slide toward the
frame when their M-16 screws
and nuts are tightened. At this stage in
the installation do not tighten the mid
mounts. After the router/ spindle is
installed they will be tightened in order to
hold the spindle firmly in the mount.
Attach the Z Spindle Mount Bottom (B) to the Z Frame
using two M-16 screws and nuts.
Z-Spindle Mid
Hole
Slot
Step 5
Attach the Z Spindle
Mount Bottom (C) to
the Z Frame using two
M-16 screws and nuts.
Do not tighten screws
Page 5