Da-Lite Da-Lift 19L Instructieboek - Pagina 3

Blader online of download pdf Instructieboek voor {categorie_naam} Da-Lite Da-Lift 19L. Da-Lite Da-Lift 19L 8 pagina's. Projector lift 220v
Ook voor Da-Lite Da-Lift 19L: Instructieboek (8 pagina's)

Suggested Methods Of Installation
1.
Mounting Da-Lift Projector Lift between joists.
Install the joists at the proper height and width to fit the Da-Lift
you are installing. See Figure 1.
NOTE: The Da-Lift must be installed on top of the joists.
Be sure to leave access from above for installation.
Lifting
Model
Capacity
Da-Lift 10M
40 lbs.
Da-Lift 15M
40 lbs.
Da-Lift 15
300 lbs.
Da-Lift 19
300 lbs.
Da-Lift 19L
300 lbs.
A
B
D
Figure 1
2. Mounting Da-Lift Projector Lift using 1/2" diameter threaded rods.
Secure four 1/2" diameter threaded rods to the ceiling at the
dimensions shown. See Figure 2, "E" and "F". Install the mounting
bracket (1-1/2" x 19") to each side of Da-Lift with 1/2" diameter bolts,
flat washers and nuts. Attach one nut on each rod and run the
nut up to the desired height.
Width
Height
A
B
22-5/8"
15"
22-5/8"
20"
30-3/4"
20"
32-3/4"
24"
42-3/4"
24"
C
When the joists are properly installed, and secured in place, slide
the Da-Lift in position. Bolt the two brackets (1-1/2" x 19") to the
frame. Lower the unit onto the joists and secure in place.
Additional bracing may be required, based on construction.
NOTE: Da-Lift projector lift must be installed level!
Depth
Height
C
D
22"
4-1/2"
22"
9-1/2"
34"
9-1/2"
38"
13-1/2"
48"
13-1/2"
E
Figure 2
Slide Da-Lift projector lift up with all (4) four threaded rods into
the mounting brackets. Install 1/2" nuts under the mounting
brackets. Adjust the frame to the proper height and level with
bottom nuts on the rod. Lock the mounting brackets in place
with the nuts on the top of each rod. Frame must be level and
solid. Additional bracing may be required, based on construction.
DIm.
Dim.
E
F
24-1/8"
14"
24-1/8"
14"
32-1/4"
16-1/4"
34-1/4"
16-1/4"
44-1/4"
16-1/4"
F
3