Air Dry Ground Mounted Montagehandleiding - Pagina 4

Blader online of download pdf Montagehandleiding voor {categorie_naam} Air Dry Ground Mounted. Air Dry Ground Mounted 8 pagina's. Clothesline

concrete around the posts filling the hole 50%- 75%. Repeat with the opposite post. Place 40/40 large
end caps onto the top of each post. May need a hammer to put into place.
Step 4:
Assembling the rear bar
Parts required:
2 x Spreaders
1 x Joiner
Take 2 spreader bars and insert them into each end of the joiner to make one long bar.
Make sure to leave the ends with the holes outside and facing the same direction.
Step 5:
Parts required
2 x 75mm bolts
2 x nuts
2 x washers
New long spreader bar (Step 4) – insert 25/25
medium end caps
Take the 75mm bolt with a washer and insert it through
the front of the top singular hole of the post and out the
back. Lift one end of the long spreader bar and place it
onto the bolt and secure with a nut. Repeat with the
opposite end. Measure the distance between the top of
the posts and the bottom of the post and make sure this
is the same and parallel. Adjust if needed.
www.airdryclotheslines.com.au
3