Air Dry Twin Fold Ground Mounted Montagehandleiding - Pagina 6
Blader online of download pdf Montagehandleiding voor {categorie_naam} Air Dry Twin Fold Ground Mounted. Air Dry Twin Fold Ground Mounted 8 pagina's. Clothesline
www.airdryclotheslines.com.au
Step 8:
Lifting and lowering the inner frame: Lift the front bar and
insert the inner stay into the hole of each arm.
Lifting and lowering the outer frame: Lift the front bar
evenly from the centre slightly past horizontal until you
heard both struts click and engage. Gently release the front
bar. To disengage the struts and lower the frame, lift the
bar evenly from the centre until both struts click and lower
the frame.
Please note, if the front bar is lifted in an uneven manner, both struts will not engage. If this happens,
reset by disengaging the strut and lower the frame. Start the process again, making sure to place your
hands directly in the centre and lifting evenly.
Warning: Do not continue to lift the bar past the engaging point (struts clicking) as this will break the
strut mechanism and a new strut will be needed at the cost of the consumer.
5