Canvas HUBBARD 168-0081-8 Montagehandleiding - Pagina 8
Blader online of download pdf Montagehandleiding voor {categorie_naam} Canvas HUBBARD 168-0081-8. Canvas HUBBARD 168-0081-8 11 pagina's. 2-tier shoe storage cabinet
S T EP- B Y- STE P I N S
T RUC TI O N
STEP 7
REQUIRES B, C, F, 1, 2, 3, 8, 11
Insert four WOOD DOWELS (B) to THE TOP (1).
Insert four HIDDEN CAMS (C) into LEFT END(2)and RIGHT END(3).
Fasten the TOP (1) to LEFT END (2) and RIGHT END (3).
Hand tighten the four HIDDEN CAMS.
Fasten the BACK (11) to SUPPORT RAIL (8), using two SCREWS (F).
Hand tighten two SCREWS (F).
C
B
B
C
B
F
B
14
HUBBARD 2-TIER SHOE STORAGE CABINET
S
F
C
F
STEP 8
REQUIRES D, E, I, J, 2, 3
Retrieve completed drawers.
Insert FASTENER (E) to aflix it to the LEFT FLIP FRAME (I), using one
SILVER FLAT HEAD SCREW (D).
Hand tighten one SILVER FLAT HEAD SCREW (D).
Repeat above step for RIGHT FLIP FRAME (J).
Repeat above step for Bottom Drawer.
E
D
E
D
15
HUBBARD 2-TIER SHOE STORAGE CABINET