ADVANCE Easy Moving VACU MATIC FREE Montage-, gebruiks- en onderhoudshandleiding - Pagina 14
Blader online of download pdf Montage-, gebruiks- en onderhoudshandleiding voor {categorie_naam} ADVANCE Easy Moving VACU MATIC FREE. ADVANCE Easy Moving VACU MATIC FREE 20 pagina's. Fuel extraction system
Suction case with motorized nozzle
9 SAFETY REQUIREMENTS FOR FUEL STORAGE TANKS
SAFETY REQUIREMENTS
for pellet storage tanks
with capacity up to 10 t
14
Keep the doors closed. Access is permitted only
to authorized personnel under the supervision of a
person outside
Do not smoke and approach fl ames or other sources
of ignition.
Danger of death due to high concentrations of carbon
monoxide (CO) and lack of oxygen.
In the 4 weeks after the fuel fi lling, enter only with a
CO detector.
Aerate the storage room for at least 15 minutes
before entering and keep the door open during your
permanence.
Ensure an adequate and permanent aeration of the
storage room through vent covers, openings or fans.
Wounding risk for moving systems
Turn off the boiler at least one hour before the pellet
is delivered.
Proceed to the fi lling according to the requirements of
the boiler manufacturer and the pellet supplier.
Protect pellets from humidity
In case of fi re suspect keep the front door and any
other opening of the storage room close and call the
fi remen.
18/07/22 Rev:1.0.5