AMPHORA Ready with Wheels Montage-instructies - Pagina 2

Blader online of download pdf Montage-instructies voor {categorie_naam} AMPHORA Ready with Wheels. AMPHORA Ready with Wheels 4 pagina's.

11)
1)
Place the front arch on the front plate of the bottom.
Then bolt the smoke guard to the arch. Do not
tighten the joints too firmly, otherwise the damage of the
refractory shapes may occur due to heat dilatation.
Place the rear arch on the rear plate of the bottom.
16)
)
Place the front
Place the front parts T9 and T10 of the body to the stand above the
front arch (
front arch (push the front edge of the body to the portal as much
as poss
as possible). Before you connect the two parts, apply
adequate amount of silicone caulk into the locks and on
adeq
silicone caulk. Use layers of the rubber pads P12 or P13
silico
to fill the gap between the glazed body and the outer stoppers
to fill the g
and glue them using the silicone caulk. Cut the rubber according to
and glue them
A purpose of the silicone caulk application between the two front parts is to connect them so
that they don't spread and also as a partial protection against water and humidity, if you don't
follow the warranty conditions to place the oven under a roof or cover sheet.
19)
9)
propertie
properties (elasticity, adhesion), and thus we suggest that the silicon
12)
12)
Place the small side arch between the front
and rear arch. Side arches should be placed with
a hole towards the front portal.
th
the whole surface between the parts. Make sure the
caulk don't fill a hole for the thermometer. Maintain
a dilatational interstice at least 3 mm between
the upper edge of the front arch and the
front part of the body. For this purpose
place the supplied dilatation pads under the
side edges. If you use more than 2 pieces of
pads on top of each other, bind them together using
the size of the stoppers.
Apply silicone caulk between the body parts and along oven
Apply
circ
circumference between the bottom edge of the body and the
s
stand - into the formed joint, the used dilatation pads should
also get fixed. Silicone the chinks in the way the silicone
disassembling the oven (e.g. in the case of a warran-
ty claim). A purpose of this silicone caulk application
is to prevent water and humidity to get into the oven
so it is strongly recommended to use it even in the
case, you would have your oven under the roof. If you
don't have oven under the roof, using silicone does not
prevent on 100% the ingress of water into the oven so always
pre
use a cover sheet. Silicon caulk may after some time lose its
use a
caulk should be applicated again on the oven after this time.
c
13)
13)
Place the central part of the arch with a hole
towards the chimney. Shape should be placed
on the top of the arch.
17)
Place the rear body to the
stand above the rear arch.
20)
0)
14)
14)
15)
Place the last two shaped pieces
into the remaining space so that the locks match.
18)
as possible. If it is necessary to align the parts, place
the supplied dilatation pads under the side edges, prefera-
bly at places marked by arrows (9 points). Do not remove the pads. If you use more than 2
pieces of pads on top of each other, bind them together using silicone caulk. Use layers of the
rubber pads P12 or P13 to fill the gap between the glazed body and the outer stoppers and
glue them using the silicone caulk. Cut the rubber according to the size of the stoppers.
Cut out a ho
Cut out a hole for the chimney (through insulation and the aluminium foil). Place the rope
seal into the opening in the front body into the prepared groove in the inner front arch
seal into
to cre
to create two threads of rope seal. Insert carefully the chimney base until the cover
flan
flange sits properly on the oven body. You can check with your hand from inside
of the chimney if the rope doesn't get distorted while inserting the chimney
base (if the rope gets damaged, heat and smoke can get into the space
between the inner shapes and the body). Turn the dumper always
lightly, not more than 90 degrees. Otherwise the thread may turn
and the sign "open, closed" may not correspond with an actual position.
Preferably don't pull out the chimney base out of the oven very often other-
wis
wise the rope seal may get damaged. When attaching chimney which is longer
than hal
than half a meter, make sure that chimney system is not exerting excessive pressure
on the body. C
on the body. Close the oven with steel door. Last, place the thermometer into the opening
behind the c
behind the chimney (for proper mounting it is necessary to pierce through the insulation).
Cover the assembled arch with at least 1 layer of
aluminium foil I8. Place the isolation bio-mat on the
aluminium foil according to the cutting plan for the
bio-mat. Make sure the bio-mat doesn't get distorted
during the application.
Place the central part of the body on
the stand between individual parts of
the body so that the cutouts of individual
shaped pieces match and joints are as narrow