Follett Horizon Elite HCD1410NJS Handleiding voor installatie-instructies - Pagina 11
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Follett Horizon Elite HCD1410NJS. Follett Horizon Elite HCD1410NJS 17 pagina's. Ice machine models with ride technology
installation instructions for drop-ins
Ook voor Follett Horizon Elite HCD1410NJS: Handmatig (8 pagina's), Handmatig (8 pagina's)
Connect louvered docking assembly to ice machine.
7.1
Ice transport tube installation
➋
• Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
➊
• Braze refrigerant lines
DROP-IN • RIDE Technology
➊
➊
➋
➊
remote condensing
Internal connections
7.2
Water line
➋
• Insert potable water line into valve
7.4
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
7
➊
➊
11