Bopp & Reuther N/A Bedieningshandleiding - Pagina 7
Blader online of download pdf Bedieningshandleiding voor {categorie_naam} Bopp & Reuther N/A. Bopp & Reuther N/A 9 pagina's. Strainer
5.4 Filter Element Mesh Size
NC: Standard 0.25 mm
Optional 0.025/0.04/0.063/0.1/0.5/0.8/1.0/2.0
N: Standard 0.25 mm
Optional 0.1/0.5/0.8/1.0/2.0
(All sizes in mm)
6 Order Information
When ordering please state:
The product data, especially weight, temperature,
pressure, viscosity, material, connection sizes,
measuring range, desired accessories, required
approvals, certificates and material certificates.
7 Standards and Directives
Explosion protection directive 94/9/EC:
The device complies with standards EN1127-1 and
EN13463-1 in accordance with ATEX100a. The
operator should always observe respective
regulations when installing and connecting the device
in explosive areas.
Pressure equipment directive 97/23/EC
The NC strainers are suitable for group 1 liquids
- Classification depends on the product's pressure
stage and capacity acc. to Article 3, §3 (designed and
produced according to excellent engineering
techniques) or acc. to Category III, Module B and C1.
Bopp & Reuther Messtechnik GmbH
The N/A or N/F strainers are suitable for group 1
liquids
- Classification generally within Category IV, with
individual acceptance acc. to Module G of the
pressure equipment directive for N/A or N/F welded
strainers.
8 Commissioning and Operation
The strainer should be connected to the process via
the flanges. (Please observe the direction of flow!!).
The operator has to ensure that the strainer cannot be
electrostatically charged. For this purpose, an
earthing strap has to be fixed to a screw on the cover
and connected to earth. This ensures that the strainer
is included in the system's equipotential bonding.
9 Safety Information
The strainer should only be used for its intended area
of application (see 2). Always observe the pressure
and temperature limits stated on the type plate as well
as all other technical data and safety information
during device installation, commissioning and
operation.
Always observe national and international regulations
concerning the operation of devices and systems
under pressure.
Prior to installation, the operator has to ensure that
the pressure bearing parts have not been damaged
during transportation.
The devices have to be installed, operated and
serviced by qualified personnel. The operator has the
responsibility to ensure that the personnel have
received sufficient and appropriate training. In cause
of doubt, please contact the manufacturer.
NC, N/A, N/F Strainer
Page 7 of 9