Advanced Air 0160 Series Installatie-, Bedienings- en Onderhoudshandleiding - Pagina 10

Blader online of download pdf Installatie-, Bedienings- en Onderhoudshandleiding voor {categorie_naam} Advanced Air 0160 Series. Advanced Air 0160 Series 13 pagina's. Air control fire damper
Ook voor Advanced Air 0160 Series: Snelstarthandleiding (14 pagina's)

Advanced Air 0160 Series Installatie-, Bedienings- en Onderhoudshandleiding
FIRE – 0160 ADJUSTABLE FRAME SYSTEM FOR RIGID SUPPORTING CONSTRUCTION (FLOOR)
Suitable
bolts
Supporting
Z-angle
0160 Series
fire damper
Patented Adjustable Frame System (AFS)
incorporating bracket, bracket slot, and Z-piece
(Patent No: GB2557865)
0160 W/AFS
PRODUCT
2013-EFECTIS-RO511C
CLASSIFICATION REPORT NO.
TESTED INSTALLATION METHOD SHOWN. DIFFERING INSTALLATION METHODS TO THIS MUST BE APPROVED BY THE BUILDING CONTROL AUTHORITY (BCA) BEFORE PROCEEDING.
Access door
for inspection /
damper reset
Three layers of
50mm fire batt
Min. 150mm thick
two hour rated
rigid supporting
construction to
BS EN 1363-1:2020
AFS rail
(40x40x4mm)
by others
RIGID SUPPORTING CONSTRUCTION (FLOOR)
APPLICATION
E120 (HO I  O)
CLASSIFICATION
Preparation
1
Ensure that the damper is kept
in a clean dry environment and
that there is no damage to the
damper.
2
Remove all the packaging and
transit ties before installation.
3
Work out the opening size to be
cut using the adjacent table.
Installation sequence
4
Install 40mm x 40mm x 4mm angle through the AFS brackets ensuring they are of sufficient length to
extend past the opening on each side by 100mm.
5
Position the dampers evenly in the centre of the opening.
6
Secure the angles to the floor. Mark the hole positions on the angle at least 50mm away from the
opening. Drill and install M8 steel anchors and bolt the angle to the floor.
7
The galvanised mild steel ductwork connecting to the damper spigot must overlap by 40mm, leaving
a 10mm clearance for any duct expansion in a fire situation.
8
The galvanised mild steel ductwork connections must be sealed with an approved galvanised mild
steel ductwork sealer and fixed with low resistance fixings such as aluminium rivets that will melt at
high temperature allowing the duct to break away without affecting the integrity of the installation.
9
'Z' angles are required to support the first layer of fire batt. These measure 50mm x 150mm x 50mm
by 100mm wide. They are to be positioned on all fire batt joints on the bottom layer and evenly spaced
on a 500mm minimum pitch.
10
The gap between the damper and the floor opening will need filling with three layers of 50mm thick
140kg/m
fire batt cut to an interference fit and pushed into place. All cut edges must be sealed with a
3
fire batt sealant to BS EN 13501-2. A fire rated intumescent mastic to BS EN 13501-2 shall be applied to
each joint.
11
The connecting galvanised mild steel ductwork must be independently supported within one metre of
the connections and have been installed in accordance with DW144.
12
An access door should be fitted on the access side of the damper for inspection and maintenance.
13
When the damper installation is complete the operation of the damper should be checked.
14
Complete DW145 Fire Damper Certificate.
Nom. duct width
Opening width min. Opening width max.
100-1,000mm
Nom. duct +100mm
Nom. duct +350mm
Nom. duct height
Opening height min. Opening height max.
100mm
Nom. duct +140mm
Nom. duct +350mm
101-300mm
Nom. duct +165mm
Nom. duct +375mm
301-525mm
Nom. duct +190mm
Nom. duct +400mm
526-700mm
Nom. duct +215mm
Nom. duct +425mm
701-925mm
Nom. duct +240mm
Nom. duct +450mm
926-1,000mm
Nom. duct +265mm
Nom. duct +475mm
10