AMQ Activ Pro 2.0 Montagehandleiding - Pagina 10
Blader online of download pdf Montagehandleiding voor {categorie_naam} AMQ Activ Pro 2.0. AMQ Activ Pro 2.0 20 pagina's.
Phase 3 | Attaching Stretcher Frame
Step 1
Double check to ensure that the Stretcher Frame
and Cantilevers are properly positioned on the
underside of the worksurface, and then fix 8
frame screws with a wireless drill.
Note: The worksurface should be center
aligned with the cantiliver depth and should
have 1'' of overhang on each end.
ST5*25
(8)
1''
Activ Pro 2.0 Assembly Guide | 10
amqsolutions.com