AMQ ACTIV DT Riser Installatiehandleiding - Pagina 3
Blader online of download pdf Installatiehandleiding voor {categorie_naam} AMQ ACTIV DT Riser. AMQ ACTIV DT Riser 8 pagina's.
Ook voor AMQ ACTIV DT Riser: Installatiehandleiding (5 pagina's), Handleiding voor probleemoplossing (2 pagina's), Montagehandleiding (9 pagina's)
INSTALLATION
Step 1
Use M6X14 screws (x4) to assemble base to
column. Wire the column to the control box.
M6X14
Step 3
Slide the primary worksurface over
the column and set column to lowest
position.
Step 5
Use M6X12 screws (x4) to attach monitor
holder to top of column. Remove the M4X10
screw under the monitor holder to release
the VESA plate. Attach the VESA plate to the
monitor and resecure to monitor holder with
the M4X10 screw.
ACTIV DT RISER INSTALLATION GUIDE | 3
Step 2
Use M6X8 screws (x4) to assemble the support plate
to pre-drilled holes at the bottom of column.
M6X8
Step 4
Wire the handset to the control box and plug in the power
cord.
Raise the column at least 8 inches. Use M6X25 screws (x4)
to mount te primary worksurface to support plate.
M6X12
M6X25
M4X10
amqsolutions.com