DQ HEATING NORTE Gebruikershandleiding
Blader online of download pdf Gebruikershandleiding voor {categorie_naam} DQ HEATING NORTE. DQ HEATING NORTE 4 pagina's.
Please unpack your delivery carefully and inspect the radiator and contents –
any damages or shortages must be notified to your supplier within 3 days of
delivery of your goods.
SPECIFICATION FOR DUNE
PLEASE NOTE: That in accordance with Part L1 2006 of the Building Regulations and BS7593:1992 code of practice for the
treatment of hot water and central heating systems, we recommend flushing the heating system before installation of new
radiators and then adding the correct quantity and type of inhibitor for use with the radiator and system to prevent
corrosion. Damage caused to systems not protected by a suitable inhibitor will not be covered by the manufacturer
warranty. It is the responsibility of the installer to ensure the correct use and suitability of the fixings provided. No liability
for costs or damages arising from failure to do so can be accepted.
Dune Radiator Fixing Instructions
Technical Specifications
Materials
Connections
Test Pressure
Testing Authority
Max operation pressure
Max working temperature
These can be cleaned using a soft damp cloth
with a non-abrasive cleaning product.
Stainless Steel
½" Flow and
Return
7 Bar
EN442
4 Bar
95c